Shipping traffic for Friday, Nov. 9
The Frontenac is shown anchored off the Duluth piers Thursday morning.
The Frontenac is shown anchored off the Duluth piers Thursday morning. The Frontenac came into port Thursday afternoon to load iron ore pellets and is scheduled to depart this morning.
DULUTH ENTRY
Morning: Kay E. Barker, arriving to load iron ore pellets and departing morning or afternoon; Frontenac, departing with iron ore pellets; Alpena, arriving to unload cement; American Integrity, departing with coal
Afternoon: Cason J. Callaway, arriving to unload limestone and departing in the evening for Two Harbors to load iron ore pellets
Evening/night: Vlieborg, arriving to load beet pulp pellets
SUPERIOR ENTRY
No traffic expected.
TWO HARBORS
No traffic expected.
For updated information 24 hours a day, call the Boatwatcher’s Hotline at (218) 722-6489.
Source: The U.S. Army Corps of Engineers Lake Superior Maritime Visitors Center in Canal Park. Arrival and departure times are not official and can vary widely.
Tags: shipping traffic, lake superior, two harbors, news, shipping, superior
More from around the web
